Kanto Regional Development Bureau, Ministry of Land, Infrastructure and Transport Sagami River System Dam Management Office
Sagami River System Dam Management Office Home > Know More about Miyagase Dam > Maintaining the Dam

Know More about Miyagase Dam

  • Maintaining the Dam

    Dam management entails a series of activities conducted round-the-clock to ensure that the objectives of Miyagase Dam, i.e. 1. protecting built-up areas from flooding, 2. securing public water supply, 3. protecting the river environment, and 4. generating electricity, are achieved.
    The management of Miyagase Dam is divided into work for managing the dam functions and work for managing the dam facilities. In order for the dam to fully exhibit its functions, it is necessary for each management component to smoothly combine.

    Gathering Information in Dam Operation

    In operating Miyagase Dam, it is necessary to constantly grasp the dam's water storage amount, incoming water flow, and discharge flow. Necessary data concerning water level and rainfall upstream of the dam and water level in the downstream are gathered from the respective observation facilities. Also, conditions in downstream rivers are monitored while grasping conditions of rainfall and water use, referring to rainfall data and long-term forecasts of the Meteorological Agency.

    • Rainfall observation facility Rainfall observation facility
    • Water level observation facility Water level observation facility

    When increasing the amount of discharge (flood adjustment) from Miyagase Dam, notification is given to related agencies, while information is issued through the dam information display panels, speakers, sirens and other warning equipment to prevent risks. Also, warning vehicles conduct safety patrols.

    Patrol Warning, dam information sign, CCTV facility, discharge warning center Patrol Warning (top left), dam information sign (top right), CCTV facility (bottom right), discharge warning center (bottom left)

    Information Exchanges with Sagami Dam and Shiroyama Dam

    To accurately implement the general (integrated) operation of dams, close collaboration that entails information exchange, etc. is conducted with Sagami Dam and Shiroyama Dam on Sagamigawa River. In this way, fine-tuned operations are conducted to make effective use of water resources.

    • Sagami Dam Sagami Dam
    • Shiroyama Dam Shiroyama Dam

    Monitoring around the Reservoir

    Monitoring is conducted to confirm safety in Lake Miyagase and its surrounding roads, slopes and so on.

    • CCTV facility CCTV facility
    • Patrol boat Patrol boat

    Management of Miyagase Dam Body

    The concrete of Miyagase Dam contains a maze-like network of monitoring corridors. These corridors are connected to the gate operation room, measurement room, etc. inside the dam and are used by operators to conduct patrols and check for any abnormalities.

    Miyagase Dam Body
Sagami River System Dam Management Office, Kanto Regional Development Bureau, Ministry of Land, Infrastructure and Transport
2145-50 Minamiyama, Aoyama-Aza, Midori-ku, Sagamihara, Kanagawa Prefecture 252-0156